Fire Service Training Facility General Construction
- Repair all holes in floor and roofs
- Replace with new expanded metal floor on upper roof.
- Re-build new hatches
- Re-build new sliding steel door access.
- Sand blast entire floors and walls as necessary to repair the surface.
- Drill in larger holes so that the water can be released better.
- Repair all railings and stairs as required to make safety.
- Replace metal at engines and build a steel heat shield to protect container
- Repaint entire area of shipping containers with a high heat paint good up to 1600 degrees and prime bare new metal with primer.
- Supply and install four (4) new 90min rated steel doors with welded push/pull entry device.