Supply Labor, equipment for the Removal of Existing & Installation of new Low Temperature
Remove & install as per the supplied scope. Remove existing 5” 3-way valve, modifying existing pipes to receive new 6” valve, tapping off existing ½” air supply pipe, install new ½” airline & tie into new valve